22.03.2021

Last section of the China-bound railway now electrified

1.jpgIn the spring of 2021, regular traffic began on the electrified section Borzya Zabaikalsk (Transbaikal Territory, Chinese border).

The electrification of the Borzya Zabaikalsk section is part of the renovation of the Karymskaya Zabaikalsk railway line linking the Trans-Siberian Railway to the Zabaikalsk Manchuria border crossing, the gateway to China.

To electrify the last section 117 km long, the railway workers installed a contact network (over 340 km of total length), 2 traction substations and 4 autotransformer substations, upgraded communication lines and traffic control devices along the route. At peak times, the project engaged 500+ people, 100+ units of construction machinery, including 80 rail-mounted units.

Russian Railways invested over 9.3 billion rubles in the electrification of the Borzya Zabaikalsk section. The through traffic on the newly-electric section boosted the daily throughput capacity of this southbound line to 110 pairs of trains.